Why Bafra OSB

An industrial zone on the Kızılırmak with completed infrastructure and incentive advantages.

5 kmlink to the Samsun–Bafra highway
50 kmPort of Samsun
50 kmRailway (Samsun)
80 kmSamsun Çarşamba Airport

Investment advantages

  • Partial-cost land allocation at an 80% discount per m²
  • 25% down payment, the rest in 18 equal monthly instalments
  • Exemption from construction and occupancy permit fees
  • Benefits of Priority Development Region status
  • Local-authority services and procedures handled quickly by the Zone Directorate
  • Free foreign-trade consultancy through BİGEM

Transport

Road: The zone is reached via a link road 5 km from the Samsun–Bafra highway.
Sea: Through the Port of Samsun (50 km), the only port in the region.
Rail: The national railway network reaches Samsun, 50 km from Bafra.
Air: The nearest airport is Samsun Çarşamba Airport (80 km by road), with direct or connecting flights to all domestic airports.

Technical infrastructure

Electricity: Each parcel's power needs are secured by the zone's own distribution centre. Details
Water: Water from 2 deep wells is pumped into a 2,500 m³ underground reservoir and a 100 m³ elevated tank before entering the network. Details
Telecommunications: Telecom and data lines are supplied through the infrastructure network.

Infrastructure works

Phase I infrastructure (2002–2006)

  • 6,951 m of road cut and fill, 76,000 m² of paved road, 6,300 m of pavement
  • 2,200 m of stormwater channel, 4,288 m of sewer pipe, 5,600 m of discharge line
  • 5,357 m of drinking-water network, 873 m of pumping line, 2,500 m³ underground and 100 m³ elevated reservoirs
  • 76 parcel manholes with network connections, telecom infrastructure

HV/LV electricity network and power line (2004)

  • In-zone network and power transmission line 100% complete, 5 transformer buildings built

Phase II infrastructure (2018–2020)

  • 4,026 m of road cut and fill, 5,806 m of stormwater channel
  • 3,110 m of HDPE corrugated sewer pipe, camera system

Physical completion of Phase I and Phase II infrastructure works is 100%.